solar:start
This is an old revision of the document!
Solar en el cortijo
Estimacion de energia
| Mes | Energia por dia 1kWp | Energia por dia 2.4kWp (cortijo) |
|---|---|---|
| Jan | 3.7 | 8.9 |
| Feb | 4.3 | 10.4 |
| Mar | 5.0 | 12.1 |
| Apr | 5.0 | 11.9 |
| May | 5.1 | 12.2 |
| Jun | 5.3 | 12.6 |
| Jul | 5.2 | 12.6 |
| Aug | 5.1 | 12.3 |
| Sep | 4.8 | 11.6 |
| Oct | 4.4 | 10.5 |
| Nov | 3.8 | 9.0 |
| Dec | 3.4 | 8.1 |
Tenemos 2x1200W = 2400W de paneles PV
- front: waree WS-200: 6 × 200Wp: 1200W
- back: waree WS-200: 6 × 200Wp: 1200W
- balcon: xxx 320(?)W * 4 = 1320W
Batterias: TODO
Controladores de carga:
- Victron MPPT 100|50: controlador max 100V PV, max 50A. → Usado para front
- Victron MPPT 100|50: controlador max 100V PV, max 50A. → Usado para back
- Victron MPPT 100|50: controlador max 100V PV, max 50A. → Usado para el balcon
solar/start.1632247675.txt.gz · Last modified: 2021/09/21 20:07 by frank